{"id":78803,"date":"2026-04-14T00:16:30","date_gmt":"2026-04-13T21:16:30","guid":{"rendered":"https:\/\/www.al-sindbad.net\/zinus-to-support-new-london-state-pier-shore-power-project\/78803\/"},"modified":"2026-04-14T00:16:30","modified_gmt":"2026-04-13T21:16:30","slug":"zinus-to-support-new-london-state-pier-shore-power-project","status":"publish","type":"post","link":"https:\/\/www.al-sindbad.net\/zinus-to-support-new-london-state-pier-shore-power-project\/78803\/","title":{"rendered":"Zinus to Support New London State Pier Shore Power Project"},"content":{"rendered":"<p><\/p>\n<div>\n<p class=\"meta\">&#13;<br \/>\n            <meta itemprop=\"datePublished\" content=\"2026-04-13T16:46:55.0000000\"\/>&#13;<br \/>\n            <span class=\"date\">April 13, 2026<\/span>&#13;<br \/>\n            <meta itemprop=\"dateModified\" content=\"2026-04-13T16:46:55.0000000\"\/>&#13;\n        <\/p>\n<div class=\"images-wrapper single\">\n<div class=\"images\">\n<div class=\"image active\">\n                <\/p>\n<p>&#13;<br \/>\n                        \u00a9 Zinus&#13;\n                    <\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<div property=\"articleBody\">\n<p>Zinus Power LLC has announced that it has been awarded a contract by the Connecticut Port Authority to support the initiatives of the New London State Pier Shore Power Project.<\/p>\n<p>Zinus\u2019 deliveries will introduce extended shore power capabilities and connections to vessels through battery-powered mobile shore power cable management systems. Delivery is scheduled for late Q4 2026.<\/p>\n<p>As part of Zinus\u2019 commitment to domestic value creation, this contract marks the first project with assembly in the United States.<\/p>\n<\/p><\/div>\n<\/div>\n<p>maritime professional<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#13; &#13; April 13, 2026&#13; &#13; &#13; \u00a9 Zinus&#13; Zinus Power LLC has announced that it has been awarded a contract by the Connecticut Port Authority to support the initiatives of the New London State Pier Shore Power Project. Zinus\u2019 deliveries will introduce extended shore power capabilities and connections to vessels through battery-powered mobile shore &hellip;<\/p>\n","protected":false},"author":1,"featured_media":78804,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[64],"tags":[],"class_list":["post-78803","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-maritime-news"],"_links":{"self":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts\/78803","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/comments?post=78803"}],"version-history":[{"count":0,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts\/78803\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/media\/78804"}],"wp:attachment":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/media?parent=78803"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/categories?post=78803"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/tags?post=78803"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}