{"id":66229,"date":"2025-08-23T09:45:33","date_gmt":"2025-08-23T06:45:33","guid":{"rendered":"https:\/\/www.al-sindbad.net\/cadeler-signs-firm-contract-with-synera-renewable-energy-for-turbine-installation-at-taiwan-offshore-wind-farm\/66229\/"},"modified":"2025-08-23T09:45:33","modified_gmt":"2025-08-23T06:45:33","slug":"cadeler-signs-firm-contract-with-synera-renewable-energy-for-turbine-installation-at-taiwan-offshore-wind-farm","status":"publish","type":"post","link":"https:\/\/www.al-sindbad.net\/cadeler-signs-firm-contract-with-synera-renewable-energy-for-turbine-installation-at-taiwan-offshore-wind-farm\/66229\/","title":{"rendered":"Cadeler Signs Firm Contract with Synera Renewable Energy for Turbine Installation at Taiwan Offshore Wind Farm"},"content":{"rendered":"<p><\/p>\n<p>Cadeler announced that it has signed a firm contract with Synera Renewable Energy (SRE) for the transportation and installation (T&amp;I) of 35 Siemens Gamesa 14MW wind turbines at the Formosa 4 Offshore Wind Farm in Taiwan. The project will be executed by one of Cadeler\u2019s next-generation M-class wind turbine installation vessels.<\/p>\n<p>marine link<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cadeler announced that it has signed a firm contract with Synera Renewable Energy (SRE) for the transportation and installation (T&amp;I) of 35 Siemens Gamesa 14MW wind turbines at the Formosa 4 Offshore Wind Farm in Taiwan. The project will be executed by one of Cadeler\u2019s next-generation M-class wind turbine installation vessels. marine link<\/p>\n","protected":false},"author":1,"featured_media":66230,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[64],"tags":[15061,2237,2370,3582,1109,1988,1131,5605,1779,23877,809,4628,1872],"class_list":["post-66229","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-maritime-news","tag-cadeler","tag-contract","tag-energy","tag-farm","tag-firm","tag-installation","tag-offshore","tag-renewable","tag-signs","tag-synera","tag-taiwan","tag-turbine","tag-wind"],"_links":{"self":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts\/66229","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/comments?post=66229"}],"version-history":[{"count":0,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts\/66229\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/media\/66230"}],"wp:attachment":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/media?parent=66229"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/categories?post=66229"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/tags?post=66229"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}