{"id":58016,"date":"2025-03-26T14:30:53","date_gmt":"2025-03-26T11:30:53","guid":{"rendered":"https:\/\/www.al-sindbad.net\/u-s-maritime-industry-delivers-in-wake-of-fsk-bridge-collapse\/58016\/"},"modified":"2025-03-26T14:30:53","modified_gmt":"2025-03-26T11:30:53","slug":"u-s-maritime-industry-delivers-in-wake-of-fsk-bridge-collapse","status":"publish","type":"post","link":"https:\/\/www.al-sindbad.net\/u-s-maritime-industry-delivers-in-wake-of-fsk-bridge-collapse\/58016\/","title":{"rendered":"U.S. Maritime Industry Delivers in Wake of FSK Bridge Collapse"},"content":{"rendered":"<p><\/p>\n<div property=\"articleBody\">\n<p>We are at the one-year since <a href=\"https:\/\/www.marinelink.com\/news\/timeline-within-minutes-departure-512529\">the Francis Scott Key (FSK) Bridge collapsed over the Patapsco River\u2019s Fort McHenry Channel<\/a> in Baltimore, Maryland. \u00a0Nearly 100 percent of the wreckage and debris removal was conducted by the Jones Act private sector U.S. maritime industry. \u00a0<br \/>The FSK collapsed at about 1:28 a.m. local time on March 26, 2025 after<strong>\u00a0the container ship MV DALI lost power and collided with one of bridge\u2019s support piers<\/strong>. \u00a0<\/p>\n<p><a href=\"https:\/\/www.marinelink.com\/news\/six-presumed-dead-baltimore-bridge-512533\">Six construction workers died<\/a> in the collapse, while two other workers survived the fall into the freezing water. The search and rescue efforts began immediately after the bridge collapsed with first responders racing to the FSK bridge area to look for survivors. \u00a0This included local and state police, fire and rescue and the U.S. Coast Guard. \u00a0Within the next 36 hours, the search and rescue operations turned into recovery in the search for victims. \u00a0This included the careful removal of debris and wreckage while divers searched the waterway for the victims.<\/p>\n<p>In that first 24 hours, the federal government set up a Unified Command of agencies to coordinate the recovery, wreckage and debris removal. \u00a0The Baltimore maritime community had become well versed in the Unified Command structure as the FSK command was nearly identical to the first Unified Command that was set up two years earlier after the grounding of the <strong>12,500 TEU containership MV EVER GIVEN<\/strong>. \u00a0Many of the same private sector Jones Act maritime companies that refloated the MV EVER GIVEN, were also involved in the FSK aftermath. \u00a0 \u00a0<\/p>\n<p>The lead agency of the Unified Command was the <strong>U.S. Coast Guard<\/strong>. \u00a0The U.S. Coast Guard served as command and control working alongside the <strong>U.S. Army Corps of Engineers<\/strong>. \u00a0Other agencies involved in the Unified Command included the <strong>U.S. Navy, Federal Bureau of Investigation, Maryland Governor and MD Departments of Transportation, Environment and State Police.<\/strong>\u00a0<\/p>\n<p>Within the Unified Command Structure, there were three main salvage companies operating for separate entities on a contract management basis. \u00a0<strong>U.S. Jones Act dredging, marine construction and salvage company DonJon Marine<\/strong> acted as the salvage operator on contract with the federal government. \u00a0The MV DALI\u2019s contacted salvage operator was <strong>Resolve Marine. \u00a0<\/strong>And, the state of Maryland enlisted <strong>Skanska USA Inc. \u00a0 \u00a0\u00a0<\/strong>\u00a0 \u00a0 \u00a0<\/p>\n<p><strong><em>While some perceived experts surmised that the port would be shut down for at least one-year, those of us the U.S. maritime industry knew it would not be crippling long term shut down of the Port of Baltimore. \u00a0We knew the American maritime industry with its dedicated companies and patriotic merchant mariners would show up and turn to. \u00a0Opening the channel was going to take weeks, not a year or even several months. \u00a0<\/em><\/strong><\/p>\n<p>The U.S.-Flag marine construction, dredging and maritime industry responded immediately to the collapse. \u00a0In fact, <strong>Cashman Dredging and Marine Contracting\u00a0<\/strong>had recently completed maintenance dredging of the Baltimore Harbor approach channels. \u00a0As a result, <strong>Cashman had its Dale Pyatt clamshell dredge, barges and other equipment anchored and stacked in Baltimore\u2019s Curtis Bay.\u00a0<\/strong>The Dale Pyatt is one of the largest clam shell dredges in North America.<\/p>\n<p>&#8220;At Cashman, we\u2019re always ready to support America\u2019s waterways,\u201d said <strong>Stephen Tobin, Chief Executive Officer of Cashman Dredging and Marine Contracting.<\/strong> \u201cWith a significant fleet already stationed in Baltimore, we were able to mobilize immediately to help with the efforts to clear wreckage and restore safe navigation as quickly as possible.\u201d<\/p>\n<p>In addition, <strong>Gahagan &amp; Bryant Associates\/S.T. Hudson Engineers (GBA\/Hudson)\u00a0<\/strong>based in Tampa, Florida sent three of its vessels into the wreckage site. \u00a0\u201cWe mobilized our hydrographic survey vessel, the SEAFIX, and had her onsite by 10:00 a.m. scanning the Patapsco River\u2019s seafloor,\u201d said Grady Bryant, Chief Executive Officer, GBA\/Hudson. \u00a0The company then brought in the BELLA MARIE and RV COASTAL, both vessels equipped with high resolution geophysical and geotechnical surveying capabilities. \u00a0These vessels were very important in locating buried pipelines, fiber optic and utility lines crossing under the Fort McHenry Channel. \u00a0<br \/>Within three days, the media was described the operation as an \u201carmada of waterborne assets\u201d being delivered to the area. \u00a0In fact, upon the arrival of Don Jon Marine\u2019s CHESAPEAKE 1000 heavy lift sheerleg crane ship arrived on the scene on March 29, 2024, NBC News correspondent Tom Costello reported: \u201cIt\u2019s the largest on the east coast, part of an armada of barges, salvage vessels and tug boats on the way.\u201d \u00a0<\/p>\n<hr\/>\n<ul>\n<li>At the height of the clean-up operations the fleet of ships, or armada of assets, dispatched to Baltimore included over 100 vessels of various sizes and capabilities, including:<\/li>\n<li>36 barges,<\/li>\n<li>27 tugboats,<\/li>\n<li>22 floating cranes,<\/li>\n<li>10 excavators,<\/li>\n<li>Several dredges,<\/li>\n<li>3 survey boats<\/li>\n<li>Skimmer,<\/li>\n<li>And a Coast Guard Cutter<\/li>\n<\/ul>\n<hr\/>\n<p>There were some notable ships, specialized vessels and heavy equipment assets that were dispatched to Baltimore for the cleanup and salvage operations. \u00a0For instance,<strong>\u00a0DonJon Marine\u2019s Chesapeake 1000<\/strong>, the largest crane ship on the east coast, capable of lifting up to 1,000 short tons was on site. \u00a0The <strong>Chesapeake 1000<\/strong> utilized the<strong>\u00a0\u201cHydraulic Grabber,\u201d\u00a0<\/strong>a 200-ton hydraulic claw grab that is ordinarily used for decommissioning giant offshore oil and gas rigs.<strong>\u00a0Kiewit\u2019s WEEKS 533 crane barge<\/strong> was instrumental in the cleanup. \u00a0The Weeks 533 is a 500 short-ton capacity crane and is the largest revolving floating crane on the east coast. \u00a0It was also the crane used to lift the US Airway\u2019s downed Airbus A320, Flight 1549 (2009) from the Hudson River (Miracle on the Hudson). <strong>\u00a0Cashman Dredging\u2019s DALE PYATT<\/strong> was the first of the big boys on the scene. \u00a0The PYATT is a 1200-ton, 180-foot-long dredge equipped with a 60-cubic-yard bucket, making it one of the largest clamshells in the Western Hemisphere. \u00a0Finally, a vessel known as the \u201cPulverizer\u201d entered the scene. \u00a0The Pulverizer is a Sterling Equipment Company brain child. \u00a0It\u2019s a crane barge set-up that uses a massive bell shape wrecking ball that drops into the river to break up the collapsed roadway and bridge deck into manageable pieces. \u00a0<\/p>\n<p>Reflecting on that day, and the remarkable clean-up efforts that followed, <strong>Jennifer Carpenter, President of the American Maritime Partnership\u00a0<\/strong>said: &#8220;The Francis Scott Key Bridge collapse was a dark day for America. We are indebted to the American mariners who worked tirelessly alongside the U.S. Coast Guard to safely and efficiently clear wreckage, reopen the channel, and restore shipping to and from the Port Baltimore. This reliable, dedicated capacity underscores the importance of the Jones Act in ensuring this industry is ready to respond in moments of crisis whenever they strike.&#8221;<\/p>\n<p><strong>A major yet often unreported part of the entire clean-up was the use of facilities and land provided by Tradepoint Atlantic in Sparrows Point, Baltimore County.<\/strong>\u00a0 Tradepoint Atlantic is a global logistics center that includes the old Sparrows Point Shipyard. \u00a0The location of Tradepoint is about 1-1\/2 nautical miles from the FSK Bridge. Salvage, dredging and marine construction crews transported huge portions of the bridge\u2019s wreckage to Tradepoint for processing, screening and crushing. \u00a0Tradepoint\u2019s sprawling land mass and specialized equipment enabled the crews and shoreside workers to cut, burn and dismantle large steel sections of the bridge. Tradepoint also played a significant role in keeping commerce flowing by accepting rerouted Roll-on, Roll-off (RoRo) vessels and Pure Car Truck Carriers (PCTCs) delivering automobiles that could not unload at Maryland\u2019s Dundalk and Masonville auto terminals. \u00a0 \u00a0 \u00a0<\/p>\n<ul>\n<li><strong><u>Key milestones and benchmarks dates:<\/u><\/strong><\/li>\n<li>March 26, 2024 (Day 1): \u00a0FSK Bridge collapses<\/li>\n<li>March 27, 2024 (Day 2): \u00a0Tradepoint Atlantic opens its property for docking ships, staging of equipment, steel recycling and receiving roadway material for crushing.<\/li>\n<li>March 26-29, 2024 (Days 1-4): \u00a0Mobilization begins with an armada of vessels heading to the Baltimore region.<\/li>\n<li>March 30, 2024 (Day 4): \u00a0U.S. Army Corps of Engineers and U.S. Coast Guard establish the FSK salvage plan. \u00a0<\/li>\n<li>April 1, 2024 (Day 6): \u00a0Sollers Point Temporary Alternate Channel: \u00a011\u2019 deep, 264\u2019 wide, 95\u2019 clearance opened.<\/li>\n<li>April 2, 2024 (Day 7): Hawkins Point Temporary Access Channel: \u00a014\u2019 deep, 280\u2019 wide, 124\u2019 clearance opened.<\/li>\n<li>April 7, 2024 (Day 12): The careful removal of containers from M\/V Dali begins.<\/li>\n<li>April 19, 2024 (Day 24): \u00a0Fort Carrol Temporary Access Channel: \u00a020\u2019 deep, 300\u2019 wide, 135\u2019 clearance is opened.<\/li>\n<li>April 25, 2024 (Day 30): \u00a0Limited Access Deep Draft Federal Channel: \u00a034\u2019 deep, 300\u2019 wide, 214\u2019 clearance (1 month mark \u2013 about 75% of ships could access the Port of Baltimore)<\/li>\n<li>May 13, 2024 (Day 48): Controlled demolition of Section 4, which had pinned the M\/V Dali under a 10-million-pound segment of Key Bridge wreckage.<\/li>\n<li>May 20, 2024 (Day 56): MV DALI removed from site.<\/li>\n<li>June 10, 2024 (Day 77): Fort McHenry Channel officially fully restored 50 feet deep, 700 feet wide (11-week mark).<\/li>\n<\/ul>\n<p>By any measure, the cleanup operation following the collapse of the FSK Bridge was a remarkable success. \u00a0The United States Merchant Marine and American industry stepped up to the task. \u00a0Approximately 50,000 tons of concrete and debris was removed from the Patapsco River and reopened the ports in 11 weeks as opposed to the 11 months that some experts predicted. \u00a0A job well done!<\/p>\n<p><strong>THE AUTHOR:\u00a0<\/strong>William P. Doyle is the CEO of the Dredging Contractors of America and the former Chief Executive of the Port of Baltimore. \u00a0He is a graduate Massachusetts Maritime Academy and served ten years as a marine engineer in the U.S. Merchant Marine.<\/p>\n<\/p><\/div>\n<p>maritime professional<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We are at the one-year since the Francis Scott Key (FSK) Bridge collapsed over the Patapsco River\u2019s Fort McHenry Channel in Baltimore, Maryland. \u00a0Nearly 100 percent of the wreckage and debris removal was conducted by the Jones Act private sector U.S. maritime industry. \u00a0The FSK collapsed at about 1:28 a.m. local time on March 26, &hellip;<\/p>\n","protected":false},"author":1,"featured_media":58017,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[64],"tags":[],"class_list":["post-58016","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-maritime-news"],"_links":{"self":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts\/58016","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/comments?post=58016"}],"version-history":[{"count":0,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts\/58016\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/media\/58017"}],"wp:attachment":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/media?parent=58016"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/categories?post=58016"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/tags?post=58016"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}