{"id":41345,"date":"2024-04-02T22:54:01","date_gmt":"2024-04-02T19:54:01","guid":{"rendered":"https:\/\/www.al-sindbad.net\/new-container-yards-completed-at-houstons-barbours-cut-terminal\/41345\/"},"modified":"2024-04-02T22:54:01","modified_gmt":"2024-04-02T19:54:01","slug":"new-container-yards-completed-at-houstons-barbours-cut-terminal","status":"publish","type":"post","link":"https:\/\/www.al-sindbad.net\/new-container-yards-completed-at-houstons-barbours-cut-terminal\/41345\/","title":{"rendered":"New Container Yards Completed at Houston&#8217;s Barbours Cut Terminal"},"content":{"rendered":"<p><\/p>\n<div>\n<p class=\"meta\">\n<meta itemprop=\"datePublished\" content=\"2024-04-02T14:30:49.0000000\"\/><br \/>\n<span class=\"date\">April 2, 2024<\/span><br \/>\n<meta itemprop=\"dateModified\" content=\"2024-04-02T14:30:49.0000000\"\/>\n<\/p>\n<div class=\"images-wrapper single\">\n<div class=\"images\">\n<div class=\"image active\">\n<\/p>\n<p>\n\u00a9 Jezper \/ Adobe Stock\n<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div property=\"articleBody\">\n<p>McCarthy Building Companies, Inc. has completed a $31.5 million upgrade of the Barbours Cut Terminal Container Yards 4 North and 5 North for the Port Houston Authority. The project was part of a modernization program to increase cargo handling efficiency. McCarthy completed rehabilitation of the existing sites in an accelerated 13-month schedule, one month ahead of schedule.<\/p>\n<p>The project scope involved removing old underground utilities and installing new utilities including laying a total of 695 feet of reinforced concrete pipe, laying 3,300 linear feet of four- to five-foot-deep trench drains, reworking roadways into the site, and putting in three and half feet of base before laying joint enforced pavement and roller compacted pavement, which was self-performed. The total combined area of two yards is 17 acers.<\/p>\n<p>McCarthy also recently began construction on Wharfs 4 and 5 at Barbours Cut, having already completed Wharfs 1, 2, and 3. The project scope includes reconstruction of the ship dock, with a total length of 1,333 feet, adding additional support piles for new, 100 foot gauge ship-to-shore cranes, updating electrical infrastructure and putting in a new water line, as well as demolishing and rebuilding several support buildings onsite. McCarthy will also self-perform all concrete-related work.<\/p>\n<p>McCarthy completed the Barbours Cut Terminal Container Yard 3 North in April 2022, in addition to Container Yards 1 North and 2 North in 2020. Wharfs 4 and 5 are scheduled to be completed in early 2026.<\/p>\n<\/div>\n<\/div>\n<p>maritime professional<\/p>\n","protected":false},"excerpt":{"rendered":"<p>April 2, 2024 \u00a9 Jezper \/ Adobe Stock McCarthy Building Companies, Inc. has completed a $31.5 million upgrade of the Barbours Cut Terminal Container Yards 4 North and 5 North for the Port Houston Authority. The project was part of a modernization program to increase cargo handling efficiency. McCarthy completed rehabilitation of the existing sites &hellip;<\/p>\n","protected":false},"author":1,"featured_media":41346,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[64],"tags":[],"class_list":["post-41345","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-maritime-news"],"_links":{"self":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts\/41345","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/comments?post=41345"}],"version-history":[{"count":0,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts\/41345\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/media\/41346"}],"wp:attachment":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/media?parent=41345"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/categories?post=41345"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/tags?post=41345"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}