{"id":29031,"date":"2022-02-01T15:35:05","date_gmt":"2022-02-01T12:35:05","guid":{"rendered":"https:\/\/www.al-sindbad.net\/video-things-are-about-to-change-in-a-big-way-for-u-s-offshore-wind\/29031\/"},"modified":"2022-02-01T15:35:05","modified_gmt":"2022-02-01T12:35:05","slug":"video-things-are-about-to-change-in-a-big-way-for-u-s-offshore-wind","status":"publish","type":"post","link":"https:\/\/www.al-sindbad.net\/video-things-are-about-to-change-in-a-big-way-for-u-s-offshore-wind\/29031\/","title":{"rendered":"VIDEO: &#8220;Things are about to change in a big way&#8221; for U.S. Offshore Wind"},"content":{"rendered":"<p><\/p>\n<div itemprop=\"text\">\n<p><strong><em>In a recent interview with Maritime Reporter TV, Philip Lewis, Director of Research, Intelatus Global Partners, breaks down the U.S. Offshore Wind market &#8216;By the Numbers.&#8217;<\/em><\/strong><\/p>\n<hr\/>\n<p>Let&#8217;s look at the world . There&#8217;s around 75GW of offshore wind farms, either operational or being built in the world today. By comparison, the U.S. currently has 42MW of operational offshore wind farms, and there&#8217;s one wind farm for 800MW that&#8217;s finally under construction.\u00a0<\/p>\n<p>But things are, in our view, things are really about to change in quite a big way.<\/p>\n<ul>\n<li>One more wind farm will start construction work this quarter,<\/li>\n<li>We&#8217;ve got 11 offshore continental shelf projects under final federal permitting review,<\/li>\n<li>There&#8217;s 17.5GW of project capacity has secured commitments from states. That means they&#8217;ve got power purchase commitments, and;<\/li>\n<li>There is 16.5GW of federal offshore leasing is underway for new project capacity.<\/li>\n<\/ul>\n<p>Now, all of this is detailed in <a href=\"http:\/\/www.intelatus.com\">our new report<\/a>, and we forecast in the report more than 46 projects that will install 43GW of capacity. That&#8217;s compared to that global 75GW, so that brings the U.S. from a small player to a major player in the offshore wind segment very quickly.<\/p>\n<p><strong><em>Those first 43 projects will require about $135 billion of CapEx &#8212; quite a substantial investment &#8212; and close to $4.5 billion of annual OpEx once they&#8217;ve been delivered.<\/em><\/strong><\/p>\n<hr\/>\n<p><span class=\"fr-video fr-fvc fr-dvb fr-draggable\" contenteditable=\"false\" draggable=\"true\"><iframe loading=\"lazy\" title=\"U.S. Offshore Wind \u201cBy the Numbers\u201d\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/Yn4d97g_Blo?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/span><\/p>\n<\/p><\/div>\n<p>maritime professional<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In a recent interview with Maritime Reporter TV, Philip Lewis, Director of Research, Intelatus Global Partners, breaks down the U.S. Offshore Wind market &#8216;By the Numbers.&#8217; Let&#8217;s look at the world . There&#8217;s around 75GW of offshore wind farms, either operational or being built in the world today. By comparison, the U.S. currently has 42MW &hellip;<\/p>\n","protected":false},"author":1,"featured_media":29032,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[64],"tags":[],"class_list":["post-29031","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-maritime-news"],"_links":{"self":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts\/29031","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/comments?post=29031"}],"version-history":[{"count":0,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts\/29031\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/media\/29032"}],"wp:attachment":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/media?parent=29031"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/categories?post=29031"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/tags?post=29031"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}