{"id":28959,"date":"2022-01-27T02:08:00","date_gmt":"2022-01-26T23:08:00","guid":{"rendered":"https:\/\/www.al-sindbad.net\/port-of-roenne-to-handle-europes-largest-offshore-wind-foundations\/28959\/"},"modified":"2022-01-27T02:08:00","modified_gmt":"2022-01-26T23:08:00","slug":"port-of-roenne-to-handle-europes-largest-offshore-wind-foundations","status":"publish","type":"post","link":"https:\/\/www.al-sindbad.net\/port-of-roenne-to-handle-europes-largest-offshore-wind-foundations\/28959\/","title":{"rendered":"Port of Roenne to handle Europe\u2019s largest offshore wind foundations"},"content":{"rendered":"<p><\/p>\n<div class=\"entry-content entry clearfix\">\n<div class=\"mailmunch-forms-before-post\" style=\"display: none !important;\"><\/div>\n<p>Port of Roenne on the Danish island of Bornholm has been selected by Belgian marine contractor <span style=\"text-decoration: underline;\"><a href=\"https:\/\/splash247.com\/deme-awarded-arcadis-ost-i-foundation-contract-by-parkwind\/\" target=\"_blank\" rel=\"noreferrer noopener\">DEME Offshore<\/a><\/span> for the shipping of wind turbine and transformer station super-sized foundations for the Arcadis Ost 1 offshore wind farm, located northeast of the island of R\u00fcgen in the German Baltic Sea.<\/p>\n<p>Denmark\u2019s most easterly commercial port will store the largest ever monopiles to be installed in Europe, with a weight of around 2,000 tonnes each for the 27 Vestas wind turbines when the construction of the 257 MW offshore wind farm owned by Parkwind commences in a few weeks.<\/p>\n<p>\u201cIt proves that our port is adapted to service all parts of the large projects that include wind turbine shipments. I know that the new project will create work for the local companies on Bornholm as we saw with the project around Kriegers Flak last year,\u201d said Jeppe la Cour, chief business officer for offshore at Port of Roenne.<\/p>\n<div class=\"mailmunch-forms-in-post-middle\" style=\"display: none !important;\"><\/div>\n<p>\u201cWe have chosen Port of Roenne as the port of shipment for our XXL monopiles because it was an obvious choice. It is due to the unique infrastructure specially designed to support heavy project loads and because the port is close to our Arcadis Ost 1 operations,\u201d said Mathieu Holvoet, project director of DEME Offshore for the Arcadis Ost project.<\/p>\n<p>DEME Offshore is the main engineering, procurement, construction, and installation (EPCI) contractor for the foundations, while the wind turbines will be installed by Heerema. The project is expected to be completed in a year and, once fully operational, will generate renewable energy to power the equivalent of up to 290,000 households.<\/p>\n<div class=\"mailmunch-forms-after-post\" style=\"display: none !important;\"><\/div>\n<div class=\"stream-item stream-item-below-post-content\">\n<div id=\"div-gpt-ad-1_95_0_1_2\"> <script>googletag.cmd.push(function() { googletag.display('div-gpt-ad-1_95_0_1_2'); });<\/script> <\/div>\n<\/div>\n<div class=\"post-bottom-meta post-bottom-tags post-tags-modern\">\n<div class=\"post-bottom-meta-title\">\n<span class=\"tie-icon-tags\" aria-hidden=\"true\"><\/span> Tags<\/div>\n<p><span class=\"tagcloud\"><a href=\"https:\/\/splash247.com\/tag\/denmark\/\" rel=\"tag\">Denmark<\/a> <a href=\"https:\/\/splash247.com\/tag\/offshore-wind\/\" rel=\"tag\">Offshore Wind<\/a><\/span>\n<\/div>\n<\/div>\n<p>splash247<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Port of Roenne on the Danish island of Bornholm has been selected by Belgian marine contractor DEME Offshore for the shipping of wind turbine and transformer station super-sized foundations for the Arcadis Ost 1 offshore wind farm, located northeast of the island of R\u00fcgen in the German Baltic Sea. Denmark\u2019s most easterly commercial port will &hellip;<\/p>\n","protected":false},"author":1,"featured_media":28960,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[59],"tags":[],"class_list":["post-28959","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-port-news"],"_links":{"self":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts\/28959","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/comments?post=28959"}],"version-history":[{"count":0,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts\/28959\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/media\/28960"}],"wp:attachment":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/media?parent=28959"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/categories?post=28959"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/tags?post=28959"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}