{"id":20545,"date":"2020-11-02T11:22:13","date_gmt":"2020-11-02T08:22:13","guid":{"rendered":"https:\/\/www.al-sindbad.net\/final-yamal-lng-carrier-for-mol-and-cosco-delivered\/20545\/"},"modified":"2020-11-02T11:22:13","modified_gmt":"2020-11-02T08:22:13","slug":"final-yamal-lng-carrier-for-mol-and-cosco-delivered","status":"publish","type":"post","link":"https:\/\/www.al-sindbad.net\/final-yamal-lng-carrier-for-mol-and-cosco-delivered\/20545\/","title":{"rendered":"Final Yamal LNG carrier for MOL and Cosco delivered"},"content":{"rendered":"<p><\/p>\n<p><strong>The fourth and final conventional Yamal LNG carrier for the MOL-COSCO JV was delivered by the Chinese Hudong-Zhonghua Shipbuilding.<\/strong><\/p>\n<figure class=\"wp-block-image size-large\"><figcaption>Courtesy of Hudong-Zhonghua Shipbuilding<\/figcaption><\/figure>\n<p>A company official confirmed the delivery of LNG Megrez took place on October 31, noting that all the vessels under the order have now been delivered. <\/p>\n<p>The 174,000-cbm LNG Megrez finalized its gas trials in September.<\/p>\n<p>The vessel has an overall length of 290 meters featuring two WinGD\u2019s dual-fuel engines and GTT\u2019s No96 membrane cargo containment system. <\/p>\n<p>The vessel was delivered in time to start its deployment on the winter route transporting the chilled fuel between Europe and China.<\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/www.offshore-energy.biz\/final-yamal-lng-carrier-for-mol-and-cosco-delivered\/\">Final Yamal LNG carrier for MOL and Cosco delivered<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/www.offshore-energy.biz\">Offshore Energy<\/a>.<\/p>\n<p>world maritime news<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The fourth and final conventional Yamal LNG carrier for the MOL-COSCO JV was delivered by the Chinese Hudong-Zhonghua Shipbuilding. Courtesy of Hudong-Zhonghua Shipbuilding A company official confirmed the delivery of LNG Megrez took place on October 31, noting that all the vessels under the order have now been delivered. The 174,000-cbm LNG Megrez finalized its &hellip;<\/p>\n","protected":false},"author":1,"featured_media":20546,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[64],"tags":[1864,109,1570,3257,523,529,358],"class_list":["post-20545","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-maritime-news","tag-carrier","tag-cosco","tag-delivered","tag-final","tag-lng","tag-mol","tag-yamal"],"_links":{"self":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts\/20545","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/comments?post=20545"}],"version-history":[{"count":0,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/posts\/20545\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/media\/20546"}],"wp:attachment":[{"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/media?parent=20545"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/categories?post=20545"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.al-sindbad.net\/rest\/wp\/v2\/tags?post=20545"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}